Monday, October 21, 2013

Demolition

Don't have to worry about texture ceilings anymore :) .   I will be adding recessed lighting to the entire main level while also moving HVAC and plumbing when necessary.  The drywall had to come down anyway.


Demo was not quite done when I snapped these pics ... master bath is not very inviting.


Living room looking in from narrow hallway, which connects to kitchen.  The wall on the right is one that will go.  To the left will be the sunroom ... once the half bath is moved.

Kitchen looking from bay window.

The door leads out to what will be the sunroom.  The is the half bath next to the door ... which needs to go in order to really open up the whole space.   Just one small problem ...

Half bath looking from other side (from kitchen to family room) ... 
all that plumbing .... coming out of the slab .... that needs to be moved


No comments:

Post a Comment